Recent content by R2023

  1. R2023

    GE gas turbine

  2. R2023

    GE gas turbine

  3. R2023

    GE gas turbine

    Dear friends in our factory we are using R, S, T GE Mark VIe Controller to running 32MW capacity turbine. Normally a controller is selected as a designated (DC) controller. But in our factory about 1.5 to 2 hours later two or three controllers are automatically selected DC controller at a time...
Top