- GTG auxiliaries are fed from the low voltage switchboard.
- The Transformer feeding the low voltage bus (from where GTG auxiliaries are fed) is out of service.
- The LV switchboard has ATS (no fast transfer), just normal auto transfer scheme
- So the auxiliaries of the GTG would be OFF during...
Do the terms operator workstation, HMI and the touch panel all refer to same thing?
Operator workstation --> Just a Monitor? or Monitor + PC?
HMI --> Device flush mounted on the front door of the cabinet with some displays for monitoring. Some may be equipped with touch screen for control...
Just wondering if STG Lube Oil Mist Separator need to be powered from Emergency or UPS power source? as collegue said as this is a device that avoids explosions so you want a secure supply.
Share you thoughts please!
We are using DEIF IE350 for load sharing/paralleling of the generators.
What is the best communication method for load sharing, there is a RJ 45 port and there is a CAN bus.
Why some auto synchronizers are provided with only ability to adjust the speed and not the voltage? In which case synchronizers with ability to adjust only speed is used? and In which case, synchronizers with ability to adjust both speed and voltage is used?
Is it practically feasible to successfully test, commission, and operate isochronous load sharing lines for load sharing between one steam turbine generator (STG - 1.5MW) and three diesel engine–driven generators (3.5MW), given that the generators are dissimilar?
Normally the steam turbine...