Hello, we have a 132kV system with GT's supplying mains power at one end and 100kms away a production site stepped down to 6.6kV. For black starts and high load starts we have (x6) 1.5MW 6.6kV DGs. When we start from black the procedure is start a DG, synchronize with the GT's, set the DG's to droop slowly build load by starting small production agitators, conveyors etc.
The problem we have is with all the small loads started and x4 DGs running in droop, when we start the first big unit 5000kW the 6.6kV voltage drops to 5.8kV which is close to tripping.
Question -
1. Will putting the DG's in (kVar) control vs pf control assist with the voltage drop. ?
2. Do I need to switch them back and forth between pf and kVar control during startups from blackout?
Previous to my role the DG's were run in kVar but placed into pf control during care and maintenance and the production site was running in island.
Thankyou
The problem we have is with all the small loads started and x4 DGs running in droop, when we start the first big unit 5000kW the 6.6kV voltage drops to 5.8kV which is close to tripping.
Question -
1. Will putting the DG's in (kVar) control vs pf control assist with the voltage drop. ?
2. Do I need to switch them back and forth between pf and kVar control during startups from blackout?
Previous to my role the DG's were run in kVar but placed into pf control during care and maintenance and the production site was running in island.
Thankyou