1. J

    Maintenance Guidelines, New Power Generation

    Hello everyone, In one of our LSTK project of Gas Turbine, 15MW,BHEL (bharat heavy electricals Ltd) make turbine & generator with Mark-VIe control, the contractor has supplied the Turbine and the generator separately, and waiting for the foundation/skid to be ready in install both. But...
  2. J

    Gas Turbine Alternator RTDs Meaning and Explanation

    Hello everyone, We are in operation of 19.6 MW GE make gas turbine (Mark Vie control system) with Brush make alternators. There are nine RTDs installed for alternator i.e. : 1. Stator coupling end : 3 nos, (DTGSF1, DTGSF2, DTGSF3) 2. Stator collector end : 3 nos : (DTGSA4, DTGSA5...
  3. J

    Functional Description of Starting of Gas Turbine

    Hello everyone, please throw some light on this. When we give a start command to a gas turbine (say GE make, 19.6 MW, Frame-5, Mark-VIe control with prime mover is diesel engine), what are the steps through which it reaches FSNL (full speed no load). i.e., Functional description of starting...
  4. J

    Fire Protection System of a Gas Turbine

    Hell everyone, Myself engage in operation of GE make gas turbine generator (19.6 MW, Frame-5, Mark-VIe control). kindly explain the fire protection system of the turbine-generators. As per the schematic, there are UV detectors & thermal detectors in aux compartment, turbine compartment, L/G...
  5. J

    Critical Gas Turbine Parameters

    Hello everyone... I am working on gas turbine operation (19.6 MW, frame-V, GE make turbine, Brush make Alternator). I would like to know what are the MINIMUM turbine parameters which are to be monitored by us to keep our turbine healthy (log sheet is too huge to monitor) along with its set...
  6. J

    Start Command of Auxiliary Motors of Gas Turbines

    Hello everyone.... I am working in operation of Gas turbine (19.6 MW, Frame-5 with Mark-VIe). My query on staring logic of auxiliary motors was explained in this forum (Thanks CSA..) Can anyone help me also to make out how the auxiliary motors (AOP & EOP) get the start command and also...
  7. J

    Starting Logic of Auxiliary Motors of Gas Turbine

    Hello everyone, I am working in a captive power plant having GE make gas turbine @19.6 MW capacity (frame-V) with Mark-VIe control system. Kindly help me understanding the logic of starting of auxiliary motors like (i) Aux Lube oil pump motor, (ii) emergency lube oil pump motor, (iii)...
Top