1. R

    GE Frame-9E Standard Combustion Machine

    We have two GE-9E machines. Recently we are changing fuel from HSD to Natural gas. Both the machines have the standard combustion with water injection facility for NOx control. When we run the machines in temperature control mode OFF condition i.e. in Simple cycle mode the maximum load range...
  2. R

    Combined Cycle Power Plant Start Up

    Our Plant consists of Two GE Frame-9E GTs, Two Vertical HRSGs (Manufacturer: HBG, China) one Steam Turbine (HTC, China). GT Rated Capacity: 115MW @ site conditions; 1013 mbarg, 32 degC, 85%RH HRSG Rating: HP Steam -75.6 barg/505 degC/182.9 t/hr LP Steam-6.3 barg/259.4 degC/36.8...
  3. R

    Relation Between Steam Turbine Inlet pressure and Steam Generator Outlet Pressure

    Is there any relationship between steam pressure at the outlet of Boiler & steam pressure before steam turbine control valve & or stop valve?
  4. R

    MarkVI-e, PFR ON an PFR OFF

    Hello, Could you please explain the details about the function of PFR ON & PFR OFF in MarVIe? Another question, How to calculate TIT (Turbine inlet Temperature)? Regards, Rokan
  5. R

    Heating and Ventilation Logic for GE-9E GT

    When two of our GE-9E gas turbines were commissioned we observed that time for both GT after a shutdown the ventilation fan for Turbine compartment (88BT) was running for compartment cooling as well as Turbine casing cooling. The fan was stop after certain time period and again start after 15...
  6. R

    GE-9E Dual Fuel Gas Turbine Turning Gear Run time

    We have two 9E dual fuel gas turbines.Both the machines were in standstill condition for 12 to 14 hours and maximum wheelspace temperature were 33 degC for each machine before going to standstill. We made the Turning System of both GT normal and put them into turning after 14hours. But GE T/A...