1. E

    MarkVIe Deadbus Breaker Closure Simulation

    Mark V TMR system is installed on our site for Frame V gas turbines. Mark V was initially configured with <I> but in 2008 <I> was upgraded to HMI (computer based and with cimplicity). Two gas turbines are installed at our site and each gas turbine has its own HMI in the GT compartment and we...
  2. E

    MarkV: L14HR and Racheting Issue

    Mark V TMR system is installed on our site for Frame V gas turbines. Mark V was initially configured with <I> but in 2008 <I> was upgraded to HMI (computer based and with cimplicity). Two gas turbines are installed at our site and each gas turbine has its own HMI in the GT compartment and we...
  3. E

    MARKV: R core A8 status and Bad EEPROM Checksum Error

    Mark V TMR system is installed on our site for Frame V gas turbines. Mark V was initially configured with <I> but in 2008 <I> was upgraded to HMI. Two gas turbines are installed at our site and each gas turbine has its own HMI in the GT compartment and we have one HMI in the control room for...
  4. E

    MARKV: Swapping BNC Connectors of EX2000 and MarkV HMI on CTBA Card

    We have two GE Frame V gas turbines installed on our site. Each of the gas turbine is communicating with EX2000 and MarkV HMI (computer based and with cimplicity). The arcnet cables are terminated on CTBA card of the C core. Can we swap these cables on CTBA card? Is it possible while maintaining...
  5. E

    Mark V: S Core Re-booted Several Times

    First of all I am thankful to the contributors like CSA and others for sharing their experiences. I am a silent reader of this forum and found it very helpful. I want to express my gratitude for all the contributors and moderators for such a wonderful forum. Mark V TMR system is installed on...