Log In
Join
Join the Community
Register
Log in
Or sign in with
Facebook
Google
GitHub
Linkedin
SIGN UP FOR OUR NEWSLETTER
Register
Main Menu
Home
Explore
Products
Cabinets & Panel Components
CNC Machines
Communication & Security
Connectors, Wire & Cable
Data Analytics & Simulation
Electrical Power Control
HMIs & SCADA
Motors & Controls
PLCs & PACs
Pneumatics & Hydraulics
Robotics
Safety
Sensors & Instruments
View all
Industry
Advanced Mfg
Agriculture
Automotive
Building
Chemical
Electronics
Energy & Infrastructure
Food & Beverage
Forest Products
Logistics
Medical & Pharma
Metal
Military & Aerospace
Natural Resources
Plastics & Polymers
Product Mfg
View all
Content
Ebooks
Forums
Industry Articles
Industry Webinars
Industry White Papers
News
Partner Content Hub
Technical Articles
Textbook
Tools
Worksheets
Articles
Latest
News
Technical Articles
Industry Articles
Industry White Papers
Forums
Latest
General Discussion
Hardware
Software
Communication
Education
Textbooks
Video Lectures
Worksheets
Industry Webinars
Ebooks
Tools
Videos
Latest
Industry Videos
Industry Webinars
Video Lectures
Giveaways
Partner Content Hub
Contact Us
Register
Log In
Network Sites
Search...
Home
Search
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
Search results
Search everything
Search threads
Search blogs
Keywords
Search titles only
Posted by
You may enter multiple names here.
Newer than
Search
Gas Turbine control - Hardware Part Trip of L4
Neo, I'll try to answer your questions, but I'm not clear on at least one of them. Yes; you are basically correct that there are four basic ways to trip the turbine <b><i>via the Speedtronic turbine control system:</b></i> 1) Application code (high-high vibration; loss of flame; exhaust...
CSA
Post #7
Oct 28, 2014
Forum:
Power Generation
Sending a Signal from MKV to Emerson DCS Via MODBUS
CuriousOne, If I only had a nickel for every time I have heard that refrain I would be a very, very wealthy young man. Yes; the file(s) in question (which you didn't name) is(are) most likely ASCII text and so can be easily edited. <b>However,</b> what to put in the file, and where, and...
CSA
Post #6
Oct 28, 2014
Forum:
Distributed Control Systems - DCS
Sending a Signal from MKV to Emerson DCS Via MODBUS
It's not really clear what mohanad is asking. It could be that he wants to establish an entirely new MODBUS link between the Mark V and the Emerson control system, in which case, that would require a long and detailed explanation--but could be gleaned from reading the manuals provided with the...
CSA
Post #4
Oct 27, 2014
Forum:
Distributed Control Systems - DCS
Gas Turbine control - Hardware Part Trip of L4
Okay, Neo, It's important to note that the fuel stop solenoids of GE-design heavy duty gas turbines with Mark VI turbine control systems are connected "between" the TRPG and TREG cards. That is, one side of the fuel stop solenoid is connected to a TRPG card, and the other side of the solenoid...
CSA
Post #4
Oct 27, 2014
Forum:
Power Generation
Mark V A6 state
G.Rajesh, Hmmm.... I have never encountered a field wiring problem that caused a processor not to be able to reach A7--but I haven't encountered every possible field problem, either. <b>HOWEVER,</b> there <i>should</i> have been a Diagnostic Alarm to indicate a problem. Thanks for the...
CSA
Post #7
Oct 24, 2014
Forum:
Power Generation
GE MS-6Fa Operations
Jotang84, If VAr control mode is selected and a VAr setpoint is entered the Speedtronic will maintain the VAr setpoint while the unit is running, and if the load setpoint changes. If Power Factor control mode is selected and a power factor setpoint is entered the Speedtronic will maintain...
CSA
Post #2
Oct 23, 2014
Forum:
Power Generation
Mark V A6 state
G.Rajesh, Long time no hear from you; welcome back. I believe markvguy wrote replies to several threads describing how to use the LCC/SLCC display and keypad to troubleshoot an inability to reach I/O State A7. You're going to have to find out which card isn't reaching A6 and then solve...
CSA
Post #4
Oct 23, 2014
Forum:
Power Generation
Westinghouse W251B11 wet compression
Ahem, > This technology is widely being used in today's combined-cycle and co-gen GT > based power plants, achieving efficiency up to 47%. It's not being used as widely as George would have us believe. For the reasons he cited: Water (it's cost to obtain); it's treatment (essentially it...
CSA
Post #3
Oct 20, 2014
Forum:
Power Generation
Gas Turbine control - Hardware Part Trip of L4
neo, Welcome back; I've been a little busy, also, so it hasn't been a problem. So, I'm taking it that you're satisfied with the L4 rung (<Q> application code) discussion(s)? I'm really curious, though, to finish the starting means thing. Your started that thread saying you'd been asked...
CSA
Post #2
Oct 19, 2014
Forum:
Power Generation
Steam Turbine MSV/GV Servo Valve
Thanks for the feedback!
CSA
Post #5
Oct 17, 2014
Forum:
Power Generation
Changing SRV Valve setting
8784597, The SRV tries to control the pressure between the SRV and the GCV. To know if it's working correctly, check FPRG and FPG2--they should be equal. And if FPG2 is equal to FPRG, then the SRV control is not the problem. If they're equal then it sounds like the fuel gas supply pressure...
CSA
Post #2
Oct 16, 2014
Forum:
Power Generation
Speed of Synchronous Generator
Saudaslam, It seems I don't have the answer to your question. Perhaps another contributor to control.com will step in and help.
CSA
Post #116
Oct 16, 2014
Forum:
Power Generation
Speed of Synchronous Generator
Saudaslam, Good, seemingly simple, question; extremely difficult to answer because it depends on how the generator-set is being operated. The short answer goes like this: If the machine was operating at its rated output for the current machine- and ambient conditions when the frequency...
CSA
Post #115
Oct 16, 2014
Forum:
Power Generation
Steam Turbine MSV/GV Servo Valve
Lube oil quality, or, rather, the lack thereof, is usually the cause of most electro-hydraulic servo-valve failures. The internal passages of most servo-valves are pretty small, and what tends to happen is that particulates and varnish tend to collect and "plate" in these passages which then...
CSA
Post #3
Oct 16, 2014
Forum:
Power Generation
How to Calibrate the Gas Turbine Vibration Sensors
> The new word is VERFIFY. CuriousOne, You said a mouthful! ;-)
CSA
Post #6
Oct 15, 2014
Forum:
Sensors & Calibration
Second Stage Nozzle Control Failure
WAC, What Diagnostic Alarms are being annunciated? The reference for the second-stage nozzle position is speed (LP speed during starting; HP speed during normal operation). And the feedback is LP speed during starting and HP sped during normal operation. Usually there will be Diagnostic...
CSA
Post #2
Oct 15, 2014
Forum:
Power Generation
Startup Gas Turbine
All, Just to clarify--the Speedtronic (Mark VI in this thread, per the original poster) <b>requires</b> a momentary contact closure to initiate a START--not a maintained contact. (In fact, most all Speedtronic command inputs are momentary, not maintained--even to select a particular fuel, a...
CSA
Post #4
Oct 13, 2014
Forum:
Power Generation
9FA and DLN 2.6+ Combustors
Jim Crown, Good morning to you, also. I've heard of people attempting this at high load (at or near 90% load) but without success. All of the gas fuel valves have to operate in perfect sequence (including purge valves) and it just usually doesn't work out very well. Especially if the gas...
CSA
Post #2
Oct 13, 2014
Forum:
Power Generation
DCS Control of Power Plants
George, I think many of us would take exception at some of your statements about testing before shipment. For auxiliary equipments which are "mass-"produced in some quantity (say, four or ten per month) which have very little variability (say cooling water modules, or filter skids) there's...
CSA
Post #15
Oct 13, 2014
Forum:
Distributed Control Systems - DCS
How to Calibrate the Gas Turbine Vibration Sensors
Any, To verify the accuracy of the calibration of any sensor one needs to know how the sensor works. If you are referring to velocity type vibration pick-ups (sensors), commonly called "seismic" vibration pick-ups, they have a small weight suspended from the top of the sensor housing with a...
CSA
Post #2
Oct 13, 2014
Forum:
Sensors & Calibration
Prev
1
2
3
4
5
6
…
Go to page
Go
10
Next
First
Prev
4 of 10
Go to page
Go
Next
Last
Top
Continue to site
QUOTE OF
THE DAY
“
”
-