Log In
Join
Join the Community
Register
Log in
Or sign in with
Facebook
Google
GitHub
Linkedin
SIGN UP FOR OUR NEWSLETTER
Register
Main Menu
Home
Explore
Products
Cabinets & Panel Components
CNC Machines
Communication & Security
Connectors, Wire & Cable
Data Analytics & Simulation
Electrical Power Control
HMIs & SCADA
Motors & Controls
PLCs & PACs
Pneumatics & Hydraulics
Robotics
Safety
Sensors & Instruments
View all
Industry
Advanced Mfg
Agriculture
Automotive
Building
Chemical
Electronics
Energy & Infrastructure
Food & Beverage
Forest Products
Logistics
Medical & Pharma
Metal
Military & Aerospace
Natural Resources
Plastics & Polymers
Product Mfg
View all
Content
Ebooks
Forums
Industry Articles
Industry Webinars
Industry White Papers
News
Partner Content Hub
Technical Articles
Textbook
Tools
Worksheets
Articles
Latest
News
Technical Articles
Industry Articles
Industry White Papers
Forums
Latest
General Discussion
Hardware
Software
Communication
Education
Textbooks
Video Lectures
Worksheets
Industry Webinars
Ebooks
Tools
Videos
Latest
Industry Videos
Industry Webinars
Video Lectures
Giveaways
Partner Content Hub
Contact Us
Register
Log In
Network Sites
Search...
Home
Search
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
Search results
Search everything
Search threads
Search blogs
Keywords
Search titles only
Posted by
You may enter multiple names here.
Newer than
Search
Changing Careers looking for advice
Most of us, when were first hired were anxious to contribute and be relevant and included. Some of us had to be taken aside and reminded, "Better to be thought a fool than to open one's mouth and remove all doubt." Sometimes it takes more than one reminding. For those who are just starting...
CSA
Post #8
Feb 17, 2014
Forum:
Jobs & Career Advising
Generator MVARS
Shaheed, Although I dislike the use of maths and vector diagrams here's a link to a pretty good explanation of "generator capability curves" (also known as reactive capability curves)...
CSA
Post #54
Feb 16, 2014
Forum:
Power Generation
RTD
Hammad Ali Zaman, When did this problem start? After a maintenance outage? Was a Mark VIe RTD input TB was changed? What changed before the problem started? Have you verified the wiring? GE typically uses a "unique" RTD wiring scheme which must be done exactly correctly? (Many...
CSA
Post #2
Feb 14, 2014
Forum:
Power Generation
Changing Careers looking for advice
Surya, Congratulations on your offer! Expect to have a pretty steep learning curve. Get to know your colleagues very well, known as "developing your network" and let them know what your skills and abilities are so that if you can help them they will know to contact you. When you get...
CSA
Post #4
Feb 13, 2014
Forum:
Jobs & Career Advising
Difference in Gas and Steam TG control philosophy
In a combined cycle power plant providing power to a larger grid the speed of the two generators is a function of the grid frequency. Both generators--and their prime movers--will operate at speeds directly proportional to grid frequency when synchronized to the grid. (Neither generator is large...
CSA
Post #5
Feb 13, 2014
Forum:
Power Generation
Cause of Reverse Power
Hi, Reverse power occurs when the energy flow-rate into the prime mover is not sufficient to maintain rated speed while the generator breaker remains closed. In this case the generator actually becomes a motor, drawing amperes from the grid in order to maintain rate speed. In effect this...
CSA
Post #13
Feb 13, 2014
Forum:
Power Generation
Generator MVARS
Shaheed, Seems you were sleeping while reading the above posts. The reactive capability curve for your generator defines the limits of operation. The specification sheets for your PTs define the maximum voltages and the saturation voltages they can withstand. There's just too much...
CSA
Post #52
Feb 12, 2014
Forum:
Power Generation
Prevent coking fuel oil nozzle
I am unfamiliar with TTHT, so can't help with that. The liquid fuel nozzles should be purged with air whenever the unit is running on gas fuel. Having said that, there have been documented cases of liquid fuel check valves leaking backwards while running on gas fuel, allowing hot...
CSA
Post #2
Feb 12, 2014
Forum:
Power Generation
Difference in Gas and Steam TG control philosophy
Saif, Welcome. When considering AC power generation, there is the generator and its prime mover. The prime mover supplies torque to the generator, which converts the torque to amperes (which are transmitted via wires to motors and other devices which convert the amperes into torque or...
CSA
Post #2
Feb 12, 2014
Forum:
Power Generation
Starting motor thermal trip
Amosiss, Presuming the Torque Adjustor limit switches are adjusted and working correctly during a normal START, purging draws (or should draw) approx. 150-160% of motor nameplate during purging, and when the purge time is complete the unit should coast down to firing speed (about 10-12%) and...
CSA
Post #2
Feb 11, 2014
Forum:
Power Generation
Changing Careers looking for advice
Surya, You didn't say what kind of job GE has offered you. Field service? "Office" engineer? It seems to be "instrumentation", but you said your background is mostly operations and mechanical. In some cases, the best instrumentation (controls) engineers I worked with had...
CSA
Post #2
Feb 10, 2014
Forum:
Jobs & Career Advising
501F firing curve
GTT, If all the inputs to the combustion reference temperature algorithm are working correctly, there's probably very little difference between actual firing temperature and the combustion temperature reference. I believe that GE stopped calling TTRF/TTRF1 the "Firing Temperature...
CSA
Post #6
Feb 8, 2014
Forum:
Power Generation
Going to Premix Mode from Lean Mode
ABDI, Primary flame detectors (I presume you are talking about primary combustion zone flame detectors--you weren't specific...) can only be mounted on combustion cans with mounts and that have combustion liners and flow sleeves with the appropriate sight "tube" holes through which the...
CSA
Post #29
Feb 8, 2014
Forum:
Power Generation
Generator MVARS
LCH, Every generator is supplied with something commonly called a "Reactive Capability Curve", sometimes called a "D-curve" (because it has a shape like a capital D). The Reactive Capability Curve defines the limits of operation for the generator--for real power (watts), lagging VArs...
CSA
Post #50
Feb 6, 2014
Forum:
Power Generation
DLN 1+ changes from Premix to Lean-lean when performing an online wash.
RedJim, A few questions. First, how long have you been doing on-line water-washes on your Frame 6B? (I presume for a period of several years; but please be as specific as possible.) Second, how long has the unit had the DLN-I+ combustion system? (In other words, was it a DLN-I unit before...
CSA
Post #2
Feb 5, 2014
Forum:
Power Generation
configuration and collect of DDR from controller
MIKEVI, Have a look at this thread: http://www.control.com/thread/1389348883 By copy to Amosiss, this topic has been covered before on control.com. As has been written before, the Control Constant current value is not a "cast in stone" value but rather a "sanity check" to make sure the...
CSA
Post #6
Feb 5, 2014
Forum:
Power Generation
Operations of 2 diesel generators in off-grid system
Roberto Benedetti, It's not necessary to have all of the synchronization equipment for operating multiple DC generators together--only for AC generators. And measuring DC is somewhat simpler than measuring AC (no PTs/CTs required). You seem intent on having multiple diesel generators...
CSA
Post #8
Feb 4, 2014
Forum:
Power Generation
Second Generator automatic startup based on load setpoint
Adrian Tomes, It most certainly is possible to automatically start a second generator to connect ("parallel" or "synchronize") to an isolated grid (sometimes called an "island" grid) when the load on the first generator increases above a certain threshold. One doesn't really start a...
CSA
Post #2
Feb 3, 2014
Forum:
Power Generation
Operations of 2 diesel generators in off-grid system
Roberto Benedetti, Most of my experience is with industrial applications (MUCH larger industrial applications producing AC power). So, most of my experience is with larger, industrial (commercial) equipment (think megawatts; tens to hundreds of megawatts). What I did not understand from...
CSA
Post #6
Feb 3, 2014
Forum:
Power Generation
Operations of 2 diesel generators in off-grid system
Roberto Benedetti, An OTS (Off-the-shelf) multiple engine-generator controller system--just for the controller--would probably cost about USD10,000.00. They are pretty specialized and highly user-unfriendly. For any kind of automated system (PLC-based or PMS (Power Management System)...
CSA
Post #4
Feb 2, 2014
Forum:
Power Generation
Prev
1
…
Go to page
Go
5
6
7
8
9
10
Next
First
Prev
7 of 10
Go to page
Go
Next
Last
Top
Continue to site
QUOTE OF
THE DAY
“
”
-