1. no_bug

    MARK I - L4 signal

    Hello everybody, I was looking at the circuit diagram and am just slightly confused about the L4 signal. It would be great if anyone could help me out with finding the exact similar L4 signal in MARK VI in the attached diagram. I think 4-4 on the raw 40 in the attached document is the same...
  2. no_bug

    Read and Write data from/to Speedtronic with python

    Hello everybody, I want to connect to Speedtronic MarkV or MarkVI or MarkVIe with ethernet and read/write data from/to it with Python. I just want to share whatever I found and find a way to do this. May it will be useful for others as well. The first step, I just want to do it and I never...
  3. no_bug

    F6- 6581b - Maintenance interval calculation

    Hello everybody. I just found a document about how to calculate "Maintenance Factor" which mentions: My questions are about the parameters: NA = Annual number of part load start/stop cycles (<60% load) 1)Is this mean that if the operator starts the GT and reaches 60% load this counter will...
  4. no_bug

    F6 - CAT diesel wiring diagram - signals

    Hi everyone. Recently we install new F6 unit in our power plan. Unfortunately, we don't have all related diesel documents and system descriptions. I sent several Emails to Eneria.com for support but I didn't get any answer! Anybody has diesel control panel wiring diagram? Diesel model : CAT C18...
  5. no_bug

    L1ZX unnecessary condition

    Hi, I just wondering am I thinking right or not about the L1ZX logic in Mark VIe? it is like this : and L1STOP is like this : The question is why GE uses L1STOP and L43CA in the same line for L1ZX logic? The reason that I ask this is that L1STOP has NORMALLY Open/Close contact L43CA in...
  6. no_bug

    IGV Part Speed

    hello i just checked the "IGV Part Speed Reference" logic and there is an offsset: CSKGVPS1: VIGV Part Speed HP Corr Speed Offset This value set is: 78.9% So if IGV open at rate of CSKGVPS2=6.67 DGA/%, thus it will be in minimum operation position (57 DG) in 82.3% speed! I just...
  7. no_bug

    MW in Synchronization Moment

    Hello, I want to know how much MW generate in synchronization with F6/42MW? Is this true which I say in sync moment we have 100.3% speed with droop 4%, so there is: 100.3 - 100 = 0.3 0.3 / 4 (droop) = 0.075 which means 7.5% of full load 7.5% of 42MW = 3.15MW Is this true? thank...
  8. no_bug

    FSRN Coefficient

    I just wondered what is TLC_Comp coefficient in FSRN? I dont know why this coefficient should multiply by FSKRN1. Thanks for answering and help me to find out what it is.
  9. no_bug

    MAX Droop

    hello I just checked the TNR logic. i just want to know is TNKR3 MAX DROOP? Or it is just MAX Speed?
  10. no_bug

    FSRN (Correction Factor)

    Hello everybody, While I was checking the FSRN logic, I just saw when Isochronous active by L83SCI_CMD, FSRNI will be like this: FSRNI = FSKRN3*(TNRI-TNH)- FSRN + FSR }+FSRNI Why FSRN and FSR should be added to this Formula? By FSR in this formula, means Current active FSR? thanks for...
Top