Log In
Join
Join the Community
Register
Log in
Or sign in with
Facebook
Google
GitHub
Linkedin
SIGN UP FOR OUR NEWSLETTER
Register
Main Menu
Home
Explore
Products
Cabinets & Panel Components
CNC Machines
Communication & Security
Connectors, Wire & Cable
Data Analytics & Simulation
Electrical Power Control
HMIs & SCADA
Motors & Controls
PLCs & PACs
Pneumatics & Hydraulics
Robotics
Safety
Sensors & Instruments
View all
Industry
Advanced Mfg
Agriculture
Automotive
Building
Chemical
Electronics
Energy & Infrastructure
Food & Beverage
Forest Products
Logistics
Medical & Pharma
Metal
Military & Aerospace
Natural Resources
Plastics & Polymers
Product Mfg
View all
Content
Ebooks
Forums
Industry Articles
Industry Webinars
Industry White Papers
News
Partner Content Hub
Technical Articles
Textbook
Tools
Worksheets
Articles
Latest
News
Technical Articles
Industry Articles
Industry White Papers
Forums
Latest
General Discussion
Hardware
Software
Communication
Education
Textbooks
Video Lectures
Worksheets
Industry Webinars
Ebooks
Tools
Videos
Latest
Industry Videos
Industry Webinars
Video Lectures
Giveaways
Partner Content Hub
Contact Us
Register
Log In
Network Sites
Search...
Home
Search
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
Search results
Search everything
Search threads
Search blogs
Keywords
Search titles only
Posted by
You may enter multiple names here.
Newer than
Search
Gas turbine Project in Africa
I second Bob Peterson's remarks and suggestion. I'm also surprised to hear that the Jenbacher division of GE produces gas turbines. I thought they only produced large reciprocating engines (think large diesel engines). And, having the infrastructure to support generation is critical. I...
CSA
Post #3
Aug 28, 2012
Forum:
Power Generation
Barrier cable gland
The English language can be a wonderful--and maddening--thing, sometimes at the same time. This is one of those questions that is best answered by referring to sales brochures and catalogues. Any manufacturer that wants to sell you something will explain their products and why their products...
CSA
Post #2
Aug 27, 2012
Forum:
General Automation Chat
Mark V HMI PC failure
William ananymous, You should not need the Acronis back-up unless something is done to corrupt or delete the data on the good hard drive--at least that's what I remember from the situation I observed a couple of years ago. It's my understanding that the purpose of the RAID configuration...
CSA
Post #2
Aug 27, 2012
Forum:
Human Machine Interface - HMI
GT 9FA tripped on loss of flame
Sriram, 'Loss of Flame' occurs when a majority of the flame detectors fail to see flame <b>AND</b> there is no other trip condition detected which would cause the fuel to be shut off and flame to be lost. If there is no fuel, there is no flame. I don't have any P&IDs for a Frame 9FA at...
CSA
Post #2
Aug 26, 2012
Forum:
Power Generation
Reactive power
And what kind of "engine" would you use to increase the motor's speed? What would be the energy source for the "engine"? How would you arrange for the energy to be delivered to the "engine"? How would you control the energy being delivered to the "engine"?
CSA
Post #33
Aug 23, 2012
Forum:
General Automation Chat
Open Circuit a Current Transformer
When current flows in the primary of a CT with an open-circuited secondary, the first thing that happens is it hums--very loudly. And the second thing that happens is that it basically explodes and any flammable components burn. This doesn't take long, and the time is inversely proportional to...
CSA
Post #26
Aug 22, 2012
Forum:
General Automation Chat
Steam turbine control operation
sriram, You have asked this question before (12 Aug 2012) and didn't receive a response. I did a quick search of control.com using the 'Search' function at the far right of the menu bar at the top of every control.com webpage for some of the terms you have confusion about and found several...
CSA
Post #2
Aug 22, 2012
Forum:
General Automation Chat
7EA gas turbine dropping out of base load
Those signals are not available to the CDB (Control Signal Database).... I gotta believe there would be Diagnostic Alarms if these signals exceeded limits. Unless someone masked them.
CSA
Post #12
Aug 21, 2012
Forum:
Power Generation
Frame 7 oil coolers
The L.O. Coolers of GE-design heavy duty gas turbines are not designed to be run in parallel. The <b>Transfer Valve</b> is not designed to be operated in mid-position. In fact, usually when it's left in mid-position for some period of time the o-rings used to seal the coolers from one another...
CSA
Post #2
Aug 21, 2012
Forum:
General Automation Chat
Gas turbine power generation frame 6 load output
Vinayak, Frankly, I don't really know how to respond. By your own admission, the event was severe. We don't know a lot about how long these severe disturbances occurred, what the frequency of the excursions were, what the peaks of the excursions were. There's a lot we don't know...
CSA
Post #11
Aug 20, 2012
Forum:
Power Generation
MKV Panel
Thanks for the feedback! Sounds like you received some good training, or at least made the best of the training you received. I wish you continued success!
CSA
Post #4
Aug 20, 2012
Forum:
General Automation Chat
Mark VI signal state transition during force/unforce
This is a great question for GE.
CSA
Post #2
Aug 20, 2012
Forum:
Process Control
7EA gas turbine dropping out of base load
The only times I've ever heard of this happening is when there is a voltage spike on the DC supply (could be from the battery charger; output filter capacitors do go bad), or when the DACA gets dirty input power, or when there was a recommended PROM upgrade that wasn't done (usually per a TIL...
CSA
Post #8
Aug 20, 2012
Forum:
Power Generation
Torque Convertor Operation
Hi! Quoting from a previous reply to this thread: >..., when asking for help with >problems (whether speaking directly with >someone, or writing to a forum like >this) one should always provide as much >information as possible about <b>when >the problem started and what changed or...
CSA
Post #15
Aug 20, 2012
Forum:
Power Generation
7EA gas turbine dropping out of base load
This is really odd. I forgot to ask the standard question: <b>When did this problem start?</b> There is usually some impedance between the generator and the utility and other generators (Main Step-up Transformers; utility transformers; etc.) so one would think there wouldn't be large...
CSA
Post #6
Aug 17, 2012
Forum:
Power Generation
MKV Panel
This is going to be a very difficult endeavour. There are basically four versions of Mark V (the heavy duty gas turbine variety--I'm not including the Mark V LM in this discussion).: "A", "Hybrid A", "B", "Hybrid B". You would need to "choose" a version to "build" and then obtain the cards used...
CSA
Post #2
Aug 17, 2012
Forum:
General Automation Chat
Generator Cold Air rating
nic, There are air-cooled generators and hydrogen-cooled generators. Air temperature is air temperature--the air that's beings used to cool the generator, the "incoming" air if you will. Hydrogen-cooled generators have gas-to-water heat exchangers('gas' being hydrogen gas), so the...
CSA
Post #2
Aug 17, 2012
Forum:
Power Generation
7EA gas turbine dropping out of base load
Have you noticed what Diagnostic Alarms are annunciated prior to and during these events? Please list them. Are there any error messages/counts being shown on any of the LCC/SLCC displays? If so, please list them--for each of the procesors (<C>, and <R>, <S>, and <T>). The numbers are not...
CSA
Post #2
Aug 15, 2012
Forum:
Power Generation
Gas turbine power generation frame 6 load output
Vinayak asked why his load decreased by so much when the frequency increased. The "inertia" and load of the compressor must also be considered; we don't have any idea about the magnitude or period of the frequency disturbance(s), but reportedly it was severe in any case and not likely to follow...
CSA
Post #9
Aug 14, 2012
Forum:
Power Generation
Mark vi
vijay, The part that would definitely be missing from any procedure you obtained from GE Controls Connect would be the admonition to open all the auxiliary motor starter mains breakers (including any DC pump motors) before powering down all of the control processors at once or powering down...
CSA
Post #4
Aug 14, 2012
Forum:
Power Generation
1
2
3
…
Go to page
Go
10
Next
1 of 10
Go to page
Go
Next
Last
Top
Continue to site
QUOTE OF
THE DAY
“
”
-