Steam turbine with MkV HMI WinNT on an island grid that has frequency fluctuations.
We have a historian to analyze power system disturbances, but the resolution is 1sec which is too slow.
I'm familiar with View2.exe and can use it to catch the information I need, but I do not know when the...
I've dug through all the IO and CSP and Application manual and I can't get a solid answer.
MkV TMR on a steam turbine, WinNT HMI. The alarm reads something like "Probe Failure" but it traces back to a logic signal called L39VF4Y. This logic is "attached" to an IO. In the IO.asg here's the...
I'm looking for ideas of manufacturer/systems to use for upgrading a MAN B&W 40 MW slow speed 2stroke diesel that is used for power generation (stationary application, base load) burning heavy fuel oil (#6) with the possibility of doing duel fuel LNG in the future.
The current control system...
We are tuning to governors on our large Island system and we have a couple units with Mk V controllers. One set is on two 66MW steam turbines (Mk V triple redundant, EX2000, EHC, WinNT HMI). Other one is on a frame 5 40MW gas turbine running liquid fuel (diesel) ONLY and an iDos.
I'm...
I've done a lot of reading of past posts. I am considering upgrading our HMI's on our two MarkV steam turbine controllers and EX2000. They were installed around 2001 and have WinNT4.0 with 2 HMI's, 2 viewers, and 1 historian. I believe I have two never used spare HMI "black boxes" from around...