S
i have gas turbine frame6 is working on gas only so i do not want to increase the funds of the maintenance so i would prefer to remove the atomizing air comp. cause i have only gas fuel
| Thread starter | Similar threads | Forum | Replies | Date |
|---|---|---|---|---|
| D | Working principle on 26BT gas turbine frame 6B | Process Control | 1 | |
| B | gas turbine GE frame 9.E trip | Electrical Engineering | 3 | |
| B | GE gas turbine frame 9.E03 | Electrical Engineering | 1 | |
| S | Gas TURBINE GE frame 9e | Power Generation | 0 | |
| U | Increasing or instable Value of GCV for Frame 9E gas turbine on MARK VI system | Control Valves | 2 |