We dont know about plant/facility /loads configurationIs it advisable to preselect Frame 9E Gas Turbine at 100MW ?
OkayThe Frame 9E Gas Turbine is connected to the National Grid. The Station has two gas turbines and one steam turbine. The gas turbines are 110MW Base Load rated. At certain times of the day the grid operator (system control centre) request the units loads to be reduced due to excess generation in the system. This is how come the unit at times is preselected at 100MW.