L
I have 3 level floats as inputs and 3 sump pumps as outputs and a AB PLC5 for control. I need control in a lead, lag, and lag2 configuration with the pumps alternating so the same pump does not run each cycle.
many thanks in advance
ll coolclay
many thanks in advance
ll coolclay