1. I

    Mark VIeS Virtual Controller Pcode Error

    Peace everyone So i managed this 6 months to learn how create a virtual controller and create a simulator for some MK VI and MK VIe projects (which are provided by the simulations blocks) And recently i am trying to do this with a MK VIe and MK VIeS projects, i configured the both virtual...
  2. I

    Safety Certified PPRO I/O Pack

    Now with MarkVIe we can have a PPRO pack which is safety certified (IEC 61508), and it can be used in the IEC 61511 certified safety loops. please can you tell me exactly what GE added to the hardware or the software (board processors) which make it able to be safety certified?, In other...
  3. I

    Mark VIeS vs Mark VIe

    The Mark VIeS is the safety platform of the mark VIe, and it has been certified to be SIL3 (controllers and IO packs). It can be a TMR, DUAL, or SIMPLEX configuration. But what i want to understand deeply is: does this safety platform has to co-exist with a control platform (mark VIe) in the...
  4. I

    Why Two Gas Valves (SRV GCV) in Frame 5 GT

    I just want to share and confirm an information that i have about using two gas valves (SRV and GCV) in the frame 5 GTs. The first valve SRV (speed regulating valve) regulates the infravalve pressure (between srv and gcv). This pressure depends on the hp speed. WHY? because the amount of fuel...
  5. I

    Looking for Insights About Dual Configuration in Mark VIe

    Can any one please give more explanation about the dual configuration in mark VIe regarding the voting and the processing of critical signals. For example the trip solenoid relays in the TRPG card will have a configuration of 1/2 or 2/2? Or we do not have any voting at all and we do have a...
Top