A
I am working on a GE Frame 6 Gas Turbine having an ISO rating of 37.5 MW. The control system hooked with it is Invensys Triconex TMR system. It has a provision of Steam Injection for Nox control which currently is inactive due to unavailability of WHRB.
Invensys claimed that they have replicated all the GE logic and also I personally verified all important Control Constant which are matching with the GE control constants. However their way of implementation is different but the final o/p seems to be matching with the desired o/p.
My query over here is that I am suspecting the O/P of our Gas Turbine at base load under ambient condition (10-15 Deg C) is less that it should be. I have gone through many threads before but I could not found the formula for relation between TTRX and CPD. In our case CPD is 9.6 bar. is there any way or formula to verify that the O/P at base load will not exceed what we are getting now based on the CPD bias curve.
Invensys claimed that they have replicated all the GE logic and also I personally verified all important Control Constant which are matching with the GE control constants. However their way of implementation is different but the final o/p seems to be matching with the desired o/p.
My query over here is that I am suspecting the O/P of our Gas Turbine at base load under ambient condition (10-15 Deg C) is less that it should be. I have gone through many threads before but I could not found the formula for relation between TTRX and CPD. In our case CPD is 9.6 bar. is there any way or formula to verify that the O/P at base load will not exceed what we are getting now based on the CPD bias curve.