Dear Engineers,
Please , assist me control a grab crane.
A grab crane is using two frequency converters to run motors for close/open and hoist(hold)/lower
The operations of the sugarcane grabber crane seems simple. With the grabber lowered to the sugarcane heap, Operator turns Joystick switch to close position.
Closing drive is turned on and accelerates to 50Hz in order to close the grabber.
Hoist (hold) motor is off at this point.
With grabber fully closed, operator turns joystick to CLOSE AND HOIST position.
Closing motor continues running while Hoisting(hold) motor accelerates to 50HZ from rest to reach the speed of closing motor. This will ensure that the grabber remains closed as it is hoisted to the position that the operator may require.
The difficulty I am facing is that the hoisting rope remains very slack as the grabber is being hoisted. This makes the crane use only two ropes tied to the closing drum instead of four ropes. We have put the hoist drive acceleration time to 0.1 secs and no matter how long we set the acceleration of closing drive, the hoist rope remains slack during hoisting.
Would you assist us correct this slackness issue.
Regards and best wishes ,
Bob.
Email:fas [at] iconnect.co.ke
Please , assist me control a grab crane.
A grab crane is using two frequency converters to run motors for close/open and hoist(hold)/lower
The operations of the sugarcane grabber crane seems simple. With the grabber lowered to the sugarcane heap, Operator turns Joystick switch to close position.
Closing drive is turned on and accelerates to 50Hz in order to close the grabber.
Hoist (hold) motor is off at this point.
With grabber fully closed, operator turns joystick to CLOSE AND HOIST position.
Closing motor continues running while Hoisting(hold) motor accelerates to 50HZ from rest to reach the speed of closing motor. This will ensure that the grabber remains closed as it is hoisted to the position that the operator may require.
The difficulty I am facing is that the hoisting rope remains very slack as the grabber is being hoisted. This makes the crane use only two ropes tied to the closing drum instead of four ropes. We have put the hoist drive acceleration time to 0.1 secs and no matter how long we set the acceleration of closing drive, the hoist rope remains slack during hoisting.
Would you assist us correct this slackness issue.
Regards and best wishes ,
Bob.