Is there a rule of thumb for estimating (guestimating) the load of the ST & GT when the Generated load is known?
Example, on a single shaft where there is one generator, we can only see the generated load.
How would you split the Generated load between the GT and ST?
I understand that at varying loads the “split” will migrate due to fluctuation in back pressure, opening of blow downs, etc.
But I was hoping that somewhere at a quick glance there was a common train of thought that said the split would be ‘x’ %GT and ‘x’ %ST.
Anyone??