T
Recently in our plant some new signals were added in the I/O and are working well in the toolbox and in the sequence.
But In order to configure the same in the cimplicity the new signals were added in the EGD data as described in the manuals.
When downloaded the above after validating and building, the toolbox which was on ONline went to OFF line with the following error messages "error D59 - SYSERR, Sys loader (59) : invalid configuration recieved: Pcode major revision diff.
Error 59 (0X3b) Invalid Pcode file".
Here the toolbox cersion in use is V.09, can any one tell me what could be the reason for the above error messages.
Is there any other way to get the new signals configured in the cimplicity pages. Any information would of great help.
Thanks,
Thomas
But In order to configure the same in the cimplicity the new signals were added in the EGD data as described in the manuals.
When downloaded the above after validating and building, the toolbox which was on ONline went to OFF line with the following error messages "error D59 - SYSERR, Sys loader (59) : invalid configuration recieved: Pcode major revision diff.
Error 59 (0X3b) Invalid Pcode file".
Here the toolbox cersion in use is V.09, can any one tell me what could be the reason for the above error messages.
Is there any other way to get the new signals configured in the cimplicity pages. Any information would of great help.
Thanks,
Thomas
