R
There is One ATS Panel with two 1000A Incomers (separate Power Source) designed to work as auto changeover. Pump (within the limit Ampere for 1000A breaker) is connected to Output of the breaker.
when panel is manually operated, there is No problem.
Problem is: When selecting in Auto position, Changeover happens automatically when power cut in either source. But when pump is switched ON - pump running for 1 minute and then all the breaker are getting off (means total panel is off).
I am sure this not overload trip. What i want to know is whether Under voltage setting can be changed to 380V to avoid under voltage tipping (now UVR setting is in 420V and panel system voltage is 460V). if we bypass the UVR ,then it is working normally.
Pls clear my doubt. mail id: [email protected]
when panel is manually operated, there is No problem.
Problem is: When selecting in Auto position, Changeover happens automatically when power cut in either source. But when pump is switched ON - pump running for 1 minute and then all the breaker are getting off (means total panel is off).
I am sure this not overload trip. What i want to know is whether Under voltage setting can be changed to 380V to avoid under voltage tipping (now UVR setting is in 420V and panel system voltage is 460V). if we bypass the UVR ,then it is working normally.
Pls clear my doubt. mail id: [email protected]
