Log In
Join
Join the Community
Register
Log in
Or sign in with
Facebook
Google
GitHub
Linkedin
SIGN UP FOR OUR NEWSLETTER
Register
Main Menu
Home
Explore
Products
Cabinets & Panel Components
CNC Machines
Communication & Security
Connectors, Wire & Cable
Data Analytics & Simulation
Electrical Power Control
HMIs & SCADA
Motors & Controls
PLCs & PACs
Pneumatics & Hydraulics
Robotics
Safety
Sensors & Instruments
View all
Industry
Advanced Mfg
Agriculture
Automotive
Building
Chemical
Electronics
Energy & Infrastructure
Food & Beverage
Forest Products
Logistics
Medical & Pharma
Metal
Military & Aerospace
Natural Resources
Plastics & Polymers
Product Mfg
View all
Content
Ebooks
Forums
Industry Articles
Industry Webinars
Industry White Papers
News
Partner Content Hub
Technical Articles
Textbook
Tools
Worksheets
Articles
Latest
News
Technical Articles
Industry Articles
Industry White Papers
Forums
Latest
General Discussion
Hardware
Software
Communication
Education
Textbooks
Video Lectures
Worksheets
Industry Webinars
Ebooks
Tools
Videos
Latest
Industry Videos
Industry Webinars
Video Lectures
Giveaways
Partner Content Hub
Contact Us
Register
Log In
Network Sites
Search...
Home
Search
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
Search results
Search everything
Search threads
Search blogs
Keywords
Search titles only
Posted by
You may enter multiple names here.
Newer than
Search
Configure CMDSTATE Blocks
Command State blocks have "masks" for both the Preset and Enable functions (they are usually four-character values). To make the Preset active or enable the feature, the Masks have to be set properly. It's not enough to just change the values of the Preset or Enable logic; the block has to be...
CSA
Post #2
Oct 12, 2010
Forum:
Power Generation
black start diesel generator
Well, you might be able to change from Droop to Isochronous during loaded operation in parallel with a grid, but you'll likely only do it once. The unit will most probably go unstable and then trip. And, no; Isochronous mode does not allow load setpoints. The whole purpose of Isochronous mode...
CSA
Post #4
Oct 12, 2010
Forum:
Power Generation
GE Turbine compressor Discharge and Fuel gas Pressure
Is it only for redundancy? If you've been operating successfully with single transmitters on a Mark IV TMR system, you can likely continue to do so with a Mark VIe TMR system, presuming you have conventional, diffusion flame combustors. However, some of the older P2 and CPD transmitters used...
CSA
Post #3
Oct 12, 2010
Forum:
General Automation Chat
Turbine Cost
suhail, I believe the two zeroes in the middles of 9001 are kind of like placeholders. The 9 signifies a Frame 9 (could be a 9E or a 9Fx, the E signifies an E-class unit). The 1 signifies a single-shaft unit (as opposed to a two-shaft machine). MS9001E is a generic way of referring to a...
CSA
Post #13
Oct 11, 2010
Forum:
Power Generation
generator on grid
We really can't address your doubts because we don't know what doubts you have. You have asked a couple of questions which have been covered many times before on control.com. Use the 'Search' feature in the right corner of the Menu bar at the top of every control.com page to search for 'droop...
CSA
Post #2
Oct 11, 2010
Forum:
General Automation Chat
Mark V controls on GE Frame 6 GT
Have you implemented the PROM upgrade procedure recommended in TIL-1480? Have you checked for the presence of corrosion on the ribbon cables/connectors? A light film of conductive grease (some is usually supplied in the boxes with spare cards purchased from GE) applied to the plastic female...
CSA
Post #2
Oct 9, 2010
Forum:
Process Control
Ge Frame 6 (6001) gas turbine tripped
The Fuel Splitter sequencing in the Speedtronic has a ramp rate for reducing the fuel being transferred from/fuel being transferred to (usually 30 seconds from the start of the transfer after some period of "pre-fill" where the control valve of the fuel being transferred to is just slightly...
CSA
Post #5
Oct 8, 2010
Forum:
Power Generation
Ge Frame 6 gas turbine hunting
13 barg hydraulic system pressure seems a little on the high side, but not excessive if I recall correctly. Is the pressure set using VPR-3 of the hydraulic pump, or VR-21 on the hydraulic manifold? It should be set using VPR-3, NOT VR-21. Is there a hydraulic accumulator in the hydraulic...
CSA
Post #6
Oct 8, 2010
Forum:
Power Generation
Ge Frame 6 (6001) gas turbine tripped
The first question to be answered (by suhail) is: Have you ever had successful fuel transfers in the past, specifically when going from liquid to gas fuels as in this case? The fuel splitter software used in most Mark V CSPs reduces the fuel reference for the fuel being transferred from while...
CSA
Post #4
Oct 8, 2010
Forum:
Power Generation
Ge Frame 6 gas turbine hunting
It would seem this problem just recently started; was it after some maintenance outage? Are there any Diagnostic Alarms annunciated during this hunting? What Diagnostic Alarms are present before and after the hunting? What Process Alarms are present before and after the hunting? You...
CSA
Post #2
Oct 7, 2010
Forum:
Power Generation
Gas turbine yellow smoke
I have made a serious ass-umption here: That the smoking is occurring during the fired shutdown from FSNL while the unit is operating on liquid fuel. If the unit is operating on gas fuel, then something is seriously amiss as white smoke rarely comes from a gas turbine exhaust while operating...
CSA
Post #8
Oct 7, 2010
Forum:
Power Generation
Gas turbine yellow smoke
We understand the smoking is coming when the turbine is being shutdown (STOP active). If you can't enter the Accessory Compartment to check the fuel pressures without tripping the turbine you're going to have some difficulty troubleshooting the problem. You didn't answer the question of...
CSA
Post #7
Oct 7, 2010
Forum:
Power Generation
GT Preselected command after temp matching
Preselected Load - A mode in which the operator can set a specific load setpoint (MW) and the Speedtronic will adjust the fuel to maintain the setpoint. Sometimes there are upper- and or lower limits on the value of the setpoint, and sometimes there is no operator-adjustable setpoint, just a...
CSA
Post #5
Oct 7, 2010
Forum:
Power Generation
Turbine Cost
Thanks, Bob! Is this purchase price, or installed cost? Or anticipated operating cost over some anticipated life expectancy?
CSA
Post #6
Oct 6, 2010
Forum:
Power Generation
gas heating system
If "cold" gas fuel is injected into the combustor there is some amount of heat lost in the combustor due to the chilling effect of the temperature of the gas. This somewhat reduces the efficiency of the turbine because it takes a little more fuel to raise the temperature of the combustion gases...
CSA
Post #2
Oct 6, 2010
Forum:
Power Generation
Turbine Cost
The numbers you cited are likely for the cost of purchasing the equipment to produce electrical power (that's a guess on my part, actually, since you haven't told us where you obtained the values). It may or may not include the cost of engineering (designing) the plant, acquiring the land...
CSA
Post #4
Oct 5, 2010
Forum:
Power Generation
Gas turbine yellow smoke
Sent, When did this problem start? What have you done to try to resolve the problem? Have you used the manual selector valve at the Liquid Fuel Flow divider to monitor the fuel pressures of each combustor/nozzle during operation and during shutdown? Your shutdown fuel "curve" may...
CSA
Post #4
Oct 5, 2010
Forum:
Power Generation
Gas Turbine Hydraulic oil low Pressure
If you are so keen to find the "culprit" and you have already examined the pump(s) and found them to be working properly (does that include the pressure compensator mechanism?), and you also replaced the relief valve(s) and the air-bleed check valve(s), then it would seem logical to continue...
CSA
Post #4
Oct 5, 2010
Forum:
Power Generation
Rebooting of Mark V controllers during grid earth fault & lightning
1. If the cable is armoured, then the industry consensus is the cable should be glanded at both ends. (Personally, I've never understood this glanding business, but no one asked me. A gland at one end of a conductor (the armour) that grounds the armour and a gland at the other end that grounds...
CSA
Post #2
Oct 4, 2010
Forum:
Process Control
Turbine Cost
The cost of any power-generating equipment (prime mover <b>and</b> generator) is usually expressed in terms of the output power. And a GE Frame 9E is a prime mover which would have to drive a generator to produce electrical power. So, for an electrical power-producing turbine and generator...
CSA
Post #2
Oct 4, 2010
Forum:
Power Generation
Prev
1
…
Go to page
Go
4
5
6
7
8
9
10
Next
First
Prev
6 of 10
Go to page
Go
Next
Last
Top
Continue to site
QUOTE OF
THE DAY
“
”
-