T
If I want to determine that GT is Stable for dynamic purpose, Is it enough or okay to consider that when load(MW) is stable for at least 90 (maybe more) seconds? What Should I consider to give remote indication that GT is stable?
| Thread starter | Similar threads | Forum | Replies | Date |
|---|---|---|---|---|
| D | 501F BPT and Exhaust Control | Power Generation | 0 | |
| W | Rotor Angle Stability | Power Generation | 1 | |
| N | Need help with Swirl Chart for Siemens 501F | Power Generation | 1 | |
| G | 501F firing curve | Power Generation | 6 | |
| P | Seal Cavity Pressure 501F GT | Power Generation | 0 |