A
I'm investigating the use of PID to control three
wells that supply water to a small municipality's
elevated water tank.
Allowing PID to run normally causes many start/stops on the lead pump as PID maintains the setpoint.
Which parameters, I'm currently using only P&I, could be adjusted to allow a wider range before the pumps are cycled?
Is this possible?
Is it feasible?
Thanks,