We intend to retrofit the control system of our gas turbines. (They are GEC gas turbines)
I wonder if one could give me more information about the systems that normally implemented for this issue. In other words which options are mostly used in this job?
We consider control and fuel system upgrading. My main concern is about the ESD signals of the turbine, that which configuration is mostly recommended? I mean a separated system/PLC from the control system is considered for that purpose or the ESD signals are included in the same PLC which is responsible of the control system.
I do appreciate your concern
I wonder if one could give me more information about the systems that normally implemented for this issue. In other words which options are mostly used in this job?
We consider control and fuel system upgrading. My main concern is about the ESD signals of the turbine, that which configuration is mostly recommended? I mean a separated system/PLC from the control system is considered for that purpose or the ESD signals are included in the same PLC which is responsible of the control system.
I do appreciate your concern