L
i want know why we have to reduce GT load at the time of online water wash OF COMPRESSOR
| Thread starter | Similar threads | Forum | Replies | Date |
|---|---|---|---|---|
| Y | Frame 9E dual fuel gas turbine with water injection as the nox control | Power Generation | 2 | |
| N | Gas Turbine Online Water Wash Requirements | Power Generation | 6 | |
| M | 9FA Gas Turbine Water Injection | Power Generation | 3 | |
| J | Gas Turbine Water Wash | Power Generation | 0 | |
| ? | GE frame 9E gas turbine water injection pump | Power Generation | 0 |