M
a GE 7E Gas turbine (60 MW) is designed with two spark plugs in combustion chambers 1&2. the spark plug#2 has excessive leak.
could we use only one spark plug and blind spark plug#2 temporarily (waiting for material).
Thx
Mohd
could we use only one spark plug and blind spark plug#2 temporarily (waiting for material).
Thx
Mohd
