The igv is not opening more than 56° after it has been loaded up to 20MW. On checking the control constant the constant value has drifted from 650-1040 Which is differ to other running units.
Frame 6b presicely
Thanks for all the time.
Thread starter | Similar threads | Forum | Replies | Date |
---|---|---|---|---|
M | gas turbine inlet air quality considerations | Power Generation | 4 | |
S | LM 2500 Power Turbine Inlet Exceeding | Power Generation | 3 | |
GE Frame 5 Gas Turbine Inlet Filter Cleaning | Power Generation | 4 | ||
S | Inlet Guide Vane (IGV) Angle | Power Generation | 2 | |
G | inlet guide vane control fault trip | Power Generation | 1 |