On one of our GE F9E DLN1 machine the load spikes to about 15MW and back to zero during synchronization/generator breaker closure and the GT trips. The trip was due to the bleed valve opening and closing when the load spike occurred. As a temporary remedy, we are forcing the bleed valve solenoid prior to synchronizing and unforcing it after the generator breaker is closed. Please advice possible root causes of this problem. GT Control is GE Speedtronic Mark V TMR with <I> interface.