M
Hi everyone,
I'm working with gas turbine which is made by GE company, Frame 7 EA with Speedtronic Mark VI, which is designed to work in temps between 50c in summer to 0c in winter.
In winter I face (sometimes) when the GT at BASE LOAD selector the turbine indicates PART LOAD. What does part load mean at that time?
I'm working with gas turbine which is made by GE company, Frame 7 EA with Speedtronic Mark VI, which is designed to work in temps between 50c in summer to 0c in winter.
In winter I face (sometimes) when the GT at BASE LOAD selector the turbine indicates PART LOAD. What does part load mean at that time?
