Required analysis on SIPROTC relay oscilloscope data of Gas Turbine Generator

Two days back while synchronising another GTG with busbar catering by 2 other similar GTGs fluctuation in electrical parameters occurred. below are the screenshots of one of the running GTG parameters. Kindly analyse and explain what was happened.
Thanks
1742138940678.png
1742138962744.png
View attachment 4771