We have a GT frame 6 engine with Mrk V control system, baseload at 30 MW load. we plan to do houseload testing with load rejection at 75% baseload. at the time of load rejection, the 52G will be released and the turbine FSNL with a load of 0.2 MW. the governor mode will automatically change from droop mode to isocronus mode to avoid reverse power. This is because the turbine load drops below the reverse spinning load. during the isocronus mode with a load of 0.2 MW (FSNL mode), the turbine will have difficulty controlling the flow rate resulting in an unstable turbine frequency, but the isocronus mode will still maintain the turbine frequency at 49.9 Hz to 50.1 Hz.
My question is, how long is the safe limit to operate the turbine with a load of 0.2 MW? What parameters should be considered to ensure that the turbine is operating normally?
We kindly ask for your advice and input in order to keep the unit in good working order.
My question is, how long is the safe limit to operate the turbine with a load of 0.2 MW? What parameters should be considered to ensure that the turbine is operating normally?
We kindly ask for your advice and input in order to keep the unit in good working order.