Hello everyone,
We are testing electric motors in our production facility and would like to recover the energy generated during testing instead of dissipating it as heat.
The test bench power is approximately **11 kW**.
We are looking for practical advice on the best way to implement an energy regeneration system. For example:
* Returning energy back to the AC grid.
* Charging a battery energy storage system.
* Using a common DC bus with multiple drives.
* Other reliable and cost-effective solutions.
Our main goals are improving energy efficiency, ensuring reliable operation, and keeping the system practical for industrial use.
If you have experience with similar projects, could you share your recommendations? Which architecture would you choose for an 11 kW test bench, and what are the main advantages and disadvantages?
Thank you in advance for your suggestions.
We are testing electric motors in our production facility and would like to recover the energy generated during testing instead of dissipating it as heat.
The test bench power is approximately **11 kW**.
We are looking for practical advice on the best way to implement an energy regeneration system. For example:
* Returning energy back to the AC grid.
* Charging a battery energy storage system.
* Using a common DC bus with multiple drives.
* Other reliable and cost-effective solutions.
Our main goals are improving energy efficiency, ensuring reliable operation, and keeping the system practical for industrial use.
If you have experience with similar projects, could you share your recommendations? Which architecture would you choose for an 11 kW test bench, and what are the main advantages and disadvantages?
Thank you in advance for your suggestions.
