M
We have GE Gas Turbine DLN Frame 9 E machine. Can We open IGV to full 84 degree at 40 MW while loading to base load. ?
| Thread starter | Similar threads | Forum | Replies | Date |
|---|---|---|---|---|
| V | [Question on the reason for operation according to IGV opening control] | Process Control | 1 | |
| S | A question about IGV and 2nd stage nozzles fail position and opening angle? | Power Generation | 17 | |
| D | IGV Opening | Power Generation | 5 | |
| S | IGV Opening at Base Load | Power Generation | 10 | |
| A | IGV Opening at Base Load. | Power Generation | 6 |