M
We have GE Gas Turbine DLN Frame 9 E machine. Can We open IGV to full 84 degree at 40 MW while loading to base load. ?
Thread starter | Similar threads | Forum | Replies | Date |
---|---|---|---|---|
S | A question about IGV and 2nd stage nozzles fail position and opening angle? | Power Generation | 16 | |
D | IGV Opening | Power Generation | 5 | |
S | IGV Opening at Base Load | Power Generation | 10 | |
A | IGV Opening at Base Load. | Power Generation | 6 | |
P | IGV Opening During Startup | Power Generation | 4 |