I would like to have comments on the difference of phase sequence which could occur in transformer. Here I have 2 transformers of different make but of same rating, impedance and vector group (Ynd1). However the phase sequence of the two transformers are different whereby Transformer #1 has the phase sequence of R-Y-B and the Transformer #2 has the phase sequence of B-Y-R. I tried to put in form of drawing as shown below. Hope it could make things clearer 
Transformer #1:
From generator on left to transformer and grid on right:
IPB LV(r)---- [xmer lv (r)]-----[xmer HV(R)]--- grid (R)
IPB LV
---- [xmer lv
]-----[xmer HV(Y)]--- grid (Y)
IPB LV(b)---- [xmer lv (b)]-----[xmer HV(B)]--- grid (B)
Transformer #2:
From generator on left to transformer and grid on right:
IPB LV(b)---- [xmer lv (b)]-----[xmer HV(B)]--- grid (B)
IPB LV
---- [xmer lv
]-----[xmer HV(Y)]--- grid (Y)
IPB LV(r)---- [xmer lv (r)]-----[xmer HV(R)]--- grid (R)
I would like to know on whether these two transformers are interchangeable without any modification. Lets assume the connection to the IPB, height, weight and other structural matters does not have any problem. I believe that should the change is done, the synchronization of the generator to the grid could not be performed due to the different phase sequence. Appreciate any comments and views on the matter as different people have different opinion on the matter.
Transformer #1:
From generator on left to transformer and grid on right:
IPB LV(r)---- [xmer lv (r)]-----[xmer HV(R)]--- grid (R)
IPB LV
IPB LV(b)---- [xmer lv (b)]-----[xmer HV(B)]--- grid (B)
Transformer #2:
From generator on left to transformer and grid on right:
IPB LV(b)---- [xmer lv (b)]-----[xmer HV(B)]--- grid (B)
IPB LV
IPB LV(r)---- [xmer lv (r)]-----[xmer HV(R)]--- grid (R)
I would like to know on whether these two transformers are interchangeable without any modification. Lets assume the connection to the IPB, height, weight and other structural matters does not have any problem. I believe that should the change is done, the synchronization of the generator to the grid could not be performed due to the different phase sequence. Appreciate any comments and views on the matter as different people have different opinion on the matter.