Anyone too assist what else should be done regarding the below question.
Baltur BGN 250 which uses DUNGS MPA22 control system.
BGN 250 water bath boiler subsequently failed too fire after the step 09 which is meant too establish flame but once it get too that stage it will just tripped on F25H literally means no flame after Safety period elapses. What could cause it because there is abundance of gas pressure on the line too requirements of the boiler based on the OEM design. What other factor should be look out too while troubleshooting. What was observed is that after while if you left the boiler alone for some hours let say like 4 to 5 hours once start signal initiated it will commence properly. Also the gas servo motor has been adjusted various since it no more working on auto again. What else should be look out for?.
Thanks everyone for your response in advance
Anyone too assist what else should be done regarding the below question.
Baltur BGN 250 which uses DUNGS MPA22 control system.
BGN 250 water bath boiler subsequently failed too fire after the step 09 which is meant too establish flame but once it get too that stage it will just tripped on F25H literally means no flame after Safety period elapses. What could cause it because there is abundance of gas pressure on the line too requirements of the boiler based on the OEM design. What other factor should be look out too while troubleshooting. What was observed is that after while if you left the boiler alone for some hours let say like 4 to 5 hours once start signal initiated it will commence properly. Also the gas servo motor has been adjusted various since it no more working on auto again. What else should be look out for?.
Thanks everyone for your response in advance