A
We have shutdown of the whole plant - which has four Gas turbines with compressors... (mechanical drive)...
Since this is the first time the whole plant is being shutdown, can someone advise on what all Instrument / control/ mechanical / electrical related activities have to be performed during this shutdown on all turbines and compressors.
This is the first shutdown after 3 years of running (i.e. plant was commissioned 3 years earlier)
Already CI has been done.. so i'm not talking about CI, its plant shutdown, so what all possible can be done during this shutdown, please advise...
Waiting ur reply.
Since this is the first time the whole plant is being shutdown, can someone advise on what all Instrument / control/ mechanical / electrical related activities have to be performed during this shutdown on all turbines and compressors.
This is the first shutdown after 3 years of running (i.e. plant was commissioned 3 years earlier)
Already CI has been done.. so i'm not talking about CI, its plant shutdown, so what all possible can be done during this shutdown, please advise...
Waiting ur reply.