Hi Everyone
I am working in a power plant where GE GTs are used, frame 9E , mark 4 DCS .
I am trying to understand how the voting is done in mark 4 and I hope some one can answer my question.
To explain my point , I am going to give an example:
3 pressure switches are used to measure hydraulic trip oil for each fuel system , for gas fuel trip oil as an example we are using 63HG-1,2,3.
Two of the 3 switches are connected to the 3 controllers <RST>, ( each switch connected to the 3 controllers) through the CIM modules. the third switches connected to core <c>. then from here it is going to <RST> software again .
Inside the 3 controllers software voting is done between the 3 switches the final the result will be calculated by the TOOT logic.
Well ,till here I can understand.
My question is:
After each controller take its decision , where these results are going , I mean how voting is done between the controllers them selfs, because in the drawing this is not clear (in the drawing they mention that if alarm contacts are closed it will go to the alarm display in CRT , but how it is going , how voting is done , S/W or H/W??)
Also another question , why they take one switch o/p to <C> , from <c> how this go again to <RST>?
I know it is very long question , but i just want to explain how far I know to start from that point for time saving .
I wish any body can help>>>>
My Regards
I am working in a power plant where GE GTs are used, frame 9E , mark 4 DCS .
I am trying to understand how the voting is done in mark 4 and I hope some one can answer my question.
To explain my point , I am going to give an example:
3 pressure switches are used to measure hydraulic trip oil for each fuel system , for gas fuel trip oil as an example we are using 63HG-1,2,3.
Two of the 3 switches are connected to the 3 controllers <RST>, ( each switch connected to the 3 controllers) through the CIM modules. the third switches connected to core <c>. then from here it is going to <RST> software again .
Inside the 3 controllers software voting is done between the 3 switches the final the result will be calculated by the TOOT logic.
Well ,till here I can understand.
My question is:
After each controller take its decision , where these results are going , I mean how voting is done between the controllers them selfs, because in the drawing this is not clear (in the drawing they mention that if alarm contacts are closed it will go to the alarm display in CRT , but how it is going , how voting is done , S/W or H/W??)
Also another question , why they take one switch o/p to <C> , from <c> how this go again to <RST>?
I know it is very long question , but i just want to explain how far I know to start from that point for time saving .
I wish any body can help>>>>
My Regards