S
Does anybody have experience with integrated BAS systems with these features. I could write my own using IEC-1131 sw, and MMI package, but the fuctions of scheduling isn't built in to the MMI or SW yet. I would appreciate any comments on systems, or experiences with these types of systems. The best ones I evaluated are proprietary BACNET systems from Allerton & Automated Logic, but they don't have integrated Security and only have limited drivers to talk to my plant floor plcs. Steve Landau VP Controls & Automation SPEC 92 Montvale Ave Stoneham MA 02180 Office: 781-438-3337 Fax: 603-843-5097 Cell: 617-908-9232 e-mail: [email protected] e-mail to pager: [email protected] (short messages only)