T
We are going to perform an electronic overspeed test on our GE 6B CT with MARKV controls. At issue is that we want to perform this after a run because GE recommends the test when the machine is warmed up for a period of time. Any issue with opening the 52G breaker at 3MW's? We can not preselect the unit down to a negative load so that we trip on reverse power. Thought about giving the unit a "STOP" and then after breaker opens give a "START" but was not sure if this releases the 94 shutdown relay.