A
Our Plant is 6FA DLN 2.0 Machine, I just want to understand that, why there is time delay provided (3 sec) for Reverse Power to open the breaker and why there is no time delay for Shutdown and Trip?
| Thread starter | Similar threads | Forum | Replies | Date |
|---|---|---|---|---|
|
|
Tripping of Steam Turbine Generator on Reverse Power Protection | Electrical Engineering | 1 | |
| M | Reverse power | Power Generation | 2 | |
| J | UNBALANCE LOAD, REVERSE POWER IN SYNCHRONIZATION | Power Generation | 57 | |
| D | Reverse Power Combustion Turbine | Power Generation | 4 | |
|
|
Reverse Power in Generators | Power Generation | 24 |