1-We have a Gas Turbine GE Frame -5 MS-5341. SRV control loop working with P2 value and reference value from control system Mark-VI. What happened if P2 Fail? Is SRV will shift to position control loop? Or How it control the speed as it is speed ratio and stop valve?
2- If CPD fails GT selects the maximum value of 10kg/cm2. Then what happen on TTRX( exhaust temperature control limit)? Is TTRX increase or decrease?
Any calculation method to measure TTRX?
3- How Isochronous and Droop Governor control works? How they share load? As once our GT trip and breaker open the other generator is on droop mood will reach to the frequency 54.34HZ and turbine will trip on reverse power relay actuation.How these two share load?
2- If CPD fails GT selects the maximum value of 10kg/cm2. Then what happen on TTRX( exhaust temperature control limit)? Is TTRX increase or decrease?
Any calculation method to measure TTRX?
3- How Isochronous and Droop Governor control works? How they share load? As once our GT trip and breaker open the other generator is on droop mood will reach to the frequency 54.34HZ and turbine will trip on reverse power relay actuation.How these two share load?