Which one is better to design a process plant which has several PID controlling loops:
1) Connect all loops to the plant PLC, do some PID programming, and let the PLC control the loops directly.
2) Utilise single-loop controllers (with PID capability) for every single loop, then integrate them to the plant PLC using communication scheme such as MODBUS, etc.