I went back and looked at the Voting Mismatch spreadsheet that was prepared before the TCDA in Loc. 3 of <QD1> was replaced, and I see SFL2 was also not being voted "properly"--but again, I believe that signal is derived from the SVL PT input signal, so if <Z> isn't seeing SVL then it's going to think SFL2 is 0.00.
I am extremely curious to see another spreadsheet with Pre-Vote voting mismatches AFTER the TCDA in Loc. 3 of <QD1> was changed--both at zero speed AND while running.
I would also be interested to know if <S> is rebooting by itself now, or if that problem has been resolved.
There are Mark* V card suppliers that are replacing the known-to-fail components on TCPS cards and providing them instead of just sending out "tested" TCPS cards with components that may be failing or may have actually failed (again, we're talking about cards that might be 20 years old, or more).
Anyway, I just wanted to say I went back and looked at the spreadsheet and saw SFL2 was not being voted properly by <T>. And, I'm confused more now because we don't know if DV is reading correctly or not.
I have to remind others--and sometimes myself--that Pre-Vote data values are just that: Pre-Vote Values. SOME signals (considered to be critical signals like liquid fuel flow divider feedback and CPD and P2 pressure are actually NOT voted because these signals are deemed critical so each processor uses its "own" values for these signals (sometimes, as with CPD and P2 pressure, there are three, redundant transmitters; liquid fuel flow divider feedback is always three, redundant speed pick-ups; if I recall correctly, synchronizing signals, like DV and SVL are single inputs "fanned out" to all three control processors AND to the three TCEA cards (because the TCEA cards provide critical synchronization check functions) so they aren't voted--but I don't have my notes to look that up at the present moment.
I am extremely curious to see another spreadsheet with Pre-Vote voting mismatches AFTER the TCDA in Loc. 3 of <QD1> was changed--both at zero speed AND while running.
I would also be interested to know if <S> is rebooting by itself now, or if that problem has been resolved.
There are Mark* V card suppliers that are replacing the known-to-fail components on TCPS cards and providing them instead of just sending out "tested" TCPS cards with components that may be failing or may have actually failed (again, we're talking about cards that might be 20 years old, or more).
Anyway, I just wanted to say I went back and looked at the spreadsheet and saw SFL2 was not being voted properly by <T>. And, I'm confused more now because we don't know if DV is reading correctly or not.
I have to remind others--and sometimes myself--that Pre-Vote data values are just that: Pre-Vote Values. SOME signals (considered to be critical signals like liquid fuel flow divider feedback and CPD and P2 pressure are actually NOT voted because these signals are deemed critical so each processor uses its "own" values for these signals (sometimes, as with CPD and P2 pressure, there are three, redundant transmitters; liquid fuel flow divider feedback is always three, redundant speed pick-ups; if I recall correctly, synchronizing signals, like DV and SVL are single inputs "fanned out" to all three control processors AND to the three TCEA cards (because the TCEA cards provide critical synchronization check functions) so they aren't voted--but I don't have my notes to look that up at the present moment.